Motion Computing FWS-DS1 Instrukcja Użytkownika Strona 73

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 257
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 72
c
GTE
-
Florida
Unbundled Network Element
(UNE)
Non-Recurring
Cost
Study
transport, EELS, and Dark Fiber. These services require facilities and circuit equipment
assignments, design for A to
2
locations, and information for updating the switch
database and programming
trunk
translations (if required.) The Advanced
-
Complex
services have a greater number of service options, more stringent testing parameters, and
are sensitive to noise and loop length.
Identified below are the workgroups involved in the AdvancedSpecial
UNEs:
Advanced/Special
-
Basic
FAC
0
DBM
-
Work Control Center (Wcc)
0
Business Response Provisioning Center
(BRPC)
-
Scheduler/Screener
-
DesignGroup
-
Testing Group
-
Administration
AdvancedlSpecial
-
Complex
FAC
Outside Plant (OSP) Engineering
BRPC
0
DBM-WCC
-
Scheduler/Screener
-
HiCap Prework Group
-
DesignGroup
-
Testing Group
-
Administration
.VIVID
Provisioning Work Groups
Following is a brief description of the provisioning work groups. (Please see Appendix
Tab
1
Process Flow Diagrams for order flow and interaction between work groups.)
FAC
The FAC has the responsibility for assignment of outside plant facilities and central
office line equipment for Exchange
-
Basic, Exchange
-
Complex, and AdvancedSpecial
-Basic
UNEs.
All Exchange and AdvancedSpecial
UNEs
require manual assignment.
The Assignment, Activation and Inventory System
(AAIS)
will automatically process an
order for Exchange-Basic UNE-Ps whenever possible. However, when mechanized
assignment does not happen, the FAC will manually provision the order.
There are specialized su/jointfilesconvert/293884/bgroups within the FAC (the Multi-line group, the CentraNet
group, and Special Services:) that assign plant facilities to the Exchange-Complex orders.
For the AdvancedSpecial services, the FAC determines the loop assignments for DSO
circuits, while the BRPC HiCap Prework Group and OSP Engineering perform this task
for DSl and above.
Within the FAC there
is
a Provisioning Support Group responsible for the simple switch
translation for vertical features and functions associated with subscriber lines.
Provisioning Support inputs these switch translations when they cannot be electronically
downloaded. Provisioning Support also works the orders that fail the Automated Service
Assurance Verification Program (ASAVP) test. (ASAVP is a system that ensures that the
15-FL
2
whebsals
-
June
20W
Page
2
of
7
Przeglądanie stron 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 256 257

Komentarze do niniejszej Instrukcji

Brak uwag