Motion Computing FWS-DS1 Instrukcja Użytkownika Strona 247

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 257
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 246
GTE
-
Florida
Wholesale Non-recurring
Cost
Study
Field
Work
Sub-Loop
Unbundling
Activity
Summary
I1
-
Field
Installation
Description
nbundled Network Elements (UNEs)
Exchange Products
Additional Line
Sub-Loop Unbundling
Customer Terminal
California
Florida
Illinois
North Carolina
Texas
Washington
Average Customer Terminal
Total
Work
iverage Drive Set-Up Verifying
Removing
Running
Complete
Work Time per
Hstance
Time
Time
Time Jumpers
Jumpers
Time
Time- Additional Total
(Miles)
(Minutes)
(Minutes) (Minutes)
(Minutes) (Minutes)
(Minutes)
AWAS Line Time Destination
,=Note
1
B=Note
1
C=Note
1
D=Note
1
E=Note
1
F=Note
1
H=Note
1
H)
J=D+E+F
K=B+I
0.65 2.41 3.21
1.14 0.32
0.70 3.12
1.01
0.26
0.16
0.58
2.38 2.01
0.47
0.23
0.92
3.07 2.48
0.52
0.24
0.62 2.77 2.42
0.49 0.47
0.88
3.42 2.34
0.64
0.85
0.73 2.86 2.25 0.59 0.38
1.58
0.28
0.40
1.37
0.96
2.35
1.16
4.30
1.23
2.19
2.87
2.09
2.21
2.48
10.55
2.94
5.30
7.48
6.43
8.39
6.85
3.04 12.96
0.70 6.06
1.10
7.68
2.13 10.55
1.92 9.20
3.84 11.81
2.12
9.71
AINS5..8
Note
I:
These
figures
are
the
results
of
Jumper and Drive Time Studies conducted
in
California, Florida, Illinois, North Carolina, Texas, and Washington.
GTE Confidential
ASBL-4
Przeglądanie stron 246
1 2 ... 242 243 244 245 246 247 248 249 250 251 252 ... 256 257

Komentarze do niniejszej Instrukcji

Brak uwag