Motion Computing FWS-DS1 Instrukcja Użytkownika Strona 201

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 257
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 200
GTE
-
Florida
Wholesale
Non-recurring
Cost
Study
Provisioning
-
Advanced/Special
Roducts
Local
Loop
Assignment
Work
Times
~~
Ln
Description
Facility Assignment
Local
Lwp
Assignment
Advanced/Spid Services
Complex
Hi-Cap
New
11
12
13
14
15
16
17
18
19
Total
Determine Loop Assignment and Loop Make-up request
Determine customer's serving
terminal
and
cable count at terminal
Determine vacant pairs for service order
Determine the
lwp
make-up
of
the
cable pair facilities serving the customer
Reserve cable pair facilities in system
Enter facilities assignment
and
complete
status
in system
Test circuit conditioning in field
Update/Initialize the service order
in
the system
~
Work
A=Note
1
Job
Title
Source
Minutes
Destination
OSP
Engineer
2.00
OSP
Engineer
200
OSP
Engineer
3.00
OSP
Engineer
11
00
OSP
Engineer
3.00
OSP
Engineer
4.50
Switch Servicm Tech
120.00
FAC Clerk
4.50
Sum Lns
(1L.18)
150.00
APLC-4
Disconnect
Determine disconnect remest
21
22
Total
Recover cable pairs, note conditioning
IFAC Clerk
FAC Clerk
Note
1:
The work minutes
listed
were provided by FAC and Outside Plant Engineering
personnel.
GTE
Gmfidential
2.00
4.50
Sum
Lns
(20.22)
6.50
APRI-I,
3,6
ALIA-2
Przeglądanie stron 200
1 2 ... 196 197 198 199 200 201 202 203 204 205 206 ... 256 257

Komentarze do niniejszej Instrukcji

Brak uwag